Pos.Work step
1.Left-click the FileLinker icon in the right taskbar corner.

2.In the FileLinker menu, select the command "New Project" an.

3.In the dialog box, enter }, "projectName". a name for your project, check the options (top right) and then click the button "Create new project".



Important: The option "Create project map/link" must be activated to generate a project map. This requires a MindManager installation or a OneNote or web link on the clipboard.

Other options:

Create subdirectories - Enable this option if you want the defined subdirectories to be created in the settings as well.

Copy templates - Enable this option if you want existing templates (files) to be copied as well.

Use project folder (settings) - Turn on this option if you want to use the defined project folder in the settings.
4.Only with a MindManager installation:

The project map is created in the background and opened with MindManager.


5.Only with a MindManager installation:

If necessary, select the branch with the inserted path and press the F5 key to update the branch.


6.Only with a MindManager installation:

The folder structure is displayed.
Optional:
After the project creation, several options are available:



Transfer to the Project Center: Select this menu item if the project link is to be transferred to the FileLinker Project Center. The project link can then be inserted into OneNote or another system.

Copy to clipboard: Select this menu item if the project link is to be copied to the clipboard. The project link can then be pasted into OneNote or another system.

Save as FileLinker file: Select this menu item if the project link is to be saved as a FileLinker file.

Copy link address to clipboard: Copies the link address to the clipboard. This link is only temporary and is useful for working with MindManager in certain cases.
Notice:For more information about the FileLinker command scope, see the FileLinker Reference Manual.